Trenching at Iles d’Yeu et de Noirmoutier wind farm

April 22, 2024

  • Client: Prysmian
  • Location: France, Gulf of Biscay
  • Scope of Work: Positioning of Barge, Trencher, Tugs and Anchors

Overview

TR Offshore Survey recently completed a four-week contract as an online surveyor onboard the Barbarossa 1, operating near the coast of France in the Gulf of Biscay. Throughout the duration of the contract, precise positioning of multiple tugs, anchors, a trencher, and the Barbarossa 1 was meticulously conducted.

Key Deliverables

  • Precise Positioning: Provided real-time positioning data for the accurate positioning of Trenching equipment.
  • Data Analysis & Reporting: Delivered comprehensive reports with actionable insights, ensuring the client’s engineering team had all the information needed for seamless construction.

The project was completed on schedule and within budget, with all deliverables meeting or exceeding the client’s expectations. TR Offshore Survey’s precision and expertise contributed to the successful installation of 50 wind turbines, now providing renewable energy to thousands of households.

Client Feedback

Thijs was an invaluable part of our team during this project. His attention to detail, professionalism, and technical expertise ensured everything went smoothly from start to finish.